Confidential Arizona Data Center

Posted on September 29th, 2020 by Renee Narvaez

The masterplan for the client facility will be looking at the entire campus, encompassing Buildings A, B and C, to utilize 50MW in Building A, 20MW in Building B, and 50MW in Building C. Scope includes preliminary meetings, surveys and investigations to determine if the site should be modernized and conceptual grading and utility design.

Western Suburb Data & Cloud Centers

Posted on September 29th, 2020 by Renee Narvaez

Bowman provided engineering services for a 2-story data center expansion and a 2-story cloud center that includes a ring road, parking, stormwater management and utility extensions.

Northern Virginia Data Center Phases I-III

Posted on September 29th, 2020 by Renee Narvaez

Bowman provided a feasibility study and a layout for the preliminary site, extensive topographic survey, floodplain study and alteration, as-built survey, preliminary earthwork analysis, final site design/permitting, utility coordination construction administration services as well as construction stake-out and final as-built surveys.

Dulles International Park – Phases I-II

Posted on September 29th, 2020 by Renee Narvaez

Bowman provided preliminary site layout and due diligence, as-built survey, preliminary earthwork analysis, final site design/permitting, construction administration services, construction stake-out, and final as-built survey for project closeout.

America Online Campus

Posted on September 15th, 2020 by Christina Nichols

Bowman designed a major portion of the 216-acre HQ campus and conducted extensive records research and as-built utility surveys, including sanitary sewer, storm sewer, water, gas, irrigation, fiber optic, telecommunications, and primary and secondary electric service lines.