Pike and Rose Block 3

Posted on July 5th, 2023 by Ariana Hanaity

Bowman was responsible for the mechanical, electrical and plumbing design for the new 253,000 sq. ft., 10-story LEED Gold certified office building and seven-story parking garage located on Block 3 of the Pike and Rose development in Rockville, Maryland. The building includes 7,000 sq. ft. of shell retail space, a fitness center and conference center.

Brightview Senior Living

Posted on July 3rd, 2023 by Renee Narvaez

Responsible for the mechanical, electrical, plumbing and fire protection design of several new Brightview Senior Living facilities. Projects included a mix of independent living units, assisted living units and memory care units as well as a full suite of amenities.

Peraton

Posted on July 3rd, 2023 by Amy Talton

Bowman performed the MEP engineering services for the 105,000 sq. ft. Reston Town Center office of Peraton. The project involves the design and construction administration for four floors of corporate office space, including five SCIF spaces totaling 8,000 sq. ft. The design modified the existing base building VAV system to meet the new tenant layout, and design new dedicated units to serve the new mission critical spaces.

Lowe’s Gallery 64

Posted on February 7th, 2023 by Renee Narvaez

Museum Place is a mixed-use redevelopment of a former DC school property in Southwest. Our scope of work included the mechanical and plumbing engineering design for Lowe’s Gallery Place, the new multi-unit residential building including a large ground-level outdoor courtyard, and two levels of underground parking structure.

ASARCO Ray Mine PLS Tank Repair

Posted on November 10th, 2022 by Renee Narvaez

PLS is stored in a stainless steel lined concrete tank at the ASARCO Ray Mine. During construction, the tank was inspected by several techniques but approximately 35 leaks were detected and attributed to defective and substandard welds. Bowman was asked to inspect and catalog the weld where leaks developed and to work with a specialized welding firm to implement a plan to repair the tank permanently.      

Clifton Guest House Structural Investigation

Posted on November 3rd, 2022 by Christina Nichols

Bowman was commissioned to perform a geotechnical/foundation, structural/framing and plumbing investigation to address observed deteriorating and distressed conditions of the house.

ASARCO Hayden Concentrator AB-BC Tailings Storage Facility Stability Buttress

Posted on November 3rd, 2022 by Renee Narvaez

Bowman provided construction quality assurance (CQA) services. The project includes site preparation, utility abandonment, earthwork for the stability buttress, Gila and San Pedro River crossings, constructed drainage to the emergency ponds and emergency channel, storm water management systems, and other improvements.

Reverse Osmosis and Filter Press Plant Design and Instrumentation Upgrades

Posted on November 3rd, 2022 by Renee Narvaez

Bowman provided designs and documentation services. including review of existing drawings and project information, engineering calculations, process and instrumentation drawings, process flow diagrams, piping/mechanical drawings, sections details, mechanical equipment list and specifications and electrical and instrumentation controls.

Arundel Elementary School

Posted on May 20th, 2022 by Renee Narvaez

A new ±113,000 sq. ft. elementary school (Pre K-2 Grade) with student capacity of 636. The team provided mechanical, plumbing and fire protection design. The scope included all new HVAC system, nine variable refrigerant systems and three single zone VAV rooftop units.

Wheaton Woods Elementary School

Posted on May 20th, 2022 by Renee Narvaez

A new elementary school is designed to accommodate 740 students. The team provided mechanical, electrical, plumbing and fire protection design, and the facility was designed to exceed ASHRAE 90.1 requirements, IBC and Montgomery County Energy Conservation Codes, as well as recommendations from the publication “Energy Efficient Design for New Buildings.”