Bowman led a team that analyzed the possibility of reaching the City’s commitment to reducing greenhouse gas emissions in supporting the shift to carbon neutrality, eco-districts and building resiliency that the City is embracing.
Bowman led a team that analyzed the possibility of reaching the City’s commitment to reducing greenhouse gas emissions in supporting the shift to carbon neutrality, eco-districts and building resiliency that the City is embracing.
Bowman has been an on-call contract mechanical and electrical engineering service provider to the City of Boulder since 2013 providing MEP design. We are familiar with the Boulder Energy Conservation Code and the City’s commitment to reducing greenhouse gas emissions by at least 80% no later than 2050.
Bowman provided commissioning services to ensure the equipment is designed, installed, and performs as expected in concert with the owner’s requirements, delivering comfort and safety in support of the district goals.
Bowman was selected as the sole-source district-wide commissioning agent. The 2017 commissioning project involved the modernization of the HVAC and lighting systems at Steamboat Springs Middle School. Our successful work on the middle school led to selection as sole-source commissioning agent for the district’s 2020 bond.
Bowman was selected as the sole-source district-wide commissioning and building performance agent. The project was partially funded by $13M BEST grant. Bowman commissioned systems including mechanical, electrical, domestic water, lighting controls, renewable energy systems and monitoring systems, and provided building envelope testing.
Bowman was selected for third party commissioning services for the construction of a new High School (HS2), renovation and addition to an existing High School (WHS), and MEP upgrades to 10 other District facilities.
Bowman provided short circuit analysis, protection device coordination study, and arc flash analysis for three Century Link data centers in Virginia, Colorado and Washington. We provided appropriate equipment ratings and settings for all adjustable overcurrent protective devices that are installed in the data centers.
Grand County, Winter Park Ranch Water and Sanitation District, and the Town of Fraser had a common interest in completing infrastructure improvements in County Road 804, including a new storm sewer system, a water main replacement, and improvements to the existing road surface and new road striping.
Bowman provided planning and design services to support a multi-year mixed used area development. The team coordinated the design and submission of multiple interconnected planning packages to construct major public infrastructure and utility projects.
Ruby Hill Park serves as a major active recreational resource for southwest Denver as well as for surrounding communities. This 80-acre park was planned and designed in multiple phases, and Bowman served as the owner’s representative providing civil design services for Phases I and II.