Mariner West Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Project was to install a new 10″ pipeline carrying Ethane from the Houston Plant to a point just south of the Ohio River located at the NOVA Chemicals property. This project was originally designed by two different consultants. Bowman was brought in to provide the civil engineering component.

Maple Avenue

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning and design services to the Town of Vienna for the Maple Avenue project. Bowman’s scope of services includes approximately a mile of comprehensive streetscape enhancement, pedestrian improvements, significant overhead utility undergrounding, storm drain utility analysis and design, a full topographic and property survey, and comprehensive easement and entitlement services.

Lincoln Yards Development

Posted on September 15th, 2020 by Renee Narvaez

Bowman is providing project management services for the design and construction of transportation improvements that will improve safety, operations, and streets in and around the Lincoln Yards Development.

Lee Steam Plant Railroad

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided extensive planning and surveying services to the analysis and design of a power plant expansion. The project consisted of surveying services for a railroad site located approximately one mile north of Lee Steam Plant, near the Dunlap Road grade crossing.

Johnson Ranch North Subdivision

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided professional engineering and surveying services including preliminary design, site control, utility system layout, site and lot grading, stormwater facility design, preparation of subdivision construction plans and final plats, and construction phase services for this 287-acre commercial and residential development. Bowman also prepared and obtained an Edwards Aquifer Contributing Zone Permit through the Texas Commission on Environmental Quality.

La Cima Subdivision

Posted on September 15th, 2020 by Renee Narvaez

La Cima is a 2,031-acre master-planned residential development consists of approximately 2,000 single-family lots, a 200-acre commercial area, an elementary school, an amenity center, many wastewater lift stations, a water storage tank, and multiple detention ponds.

Kanner Crossing

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering and surveying services for this project. The design and permitting included parking lots, driveways, stormwater management system, potable water distribution system and wastewater collection/transmission system. Bowman provided construction observation services and certification of the various permits received from the required regulatory agencies.

Ken Lawrence Stream Valley Trail

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided full service engineering, environmental, surveying and construction administration for the restoration of 800 lf of degraded stream valley, installation of 1,000 lf of new trails, and a 30 foot long pedestrian bridge crossing, as well as the first two synthetic turf fields in Tysons Virginia.

Kennedy Space Center’s Visitor Center Debus Conference Center

Posted on September 15th, 2020 by Christina Nichols

Bowman provided its survey expertise to inventory and locate improvements around Kennedy Space Center in preparation for expansion plans. The team had to navigate security controls as well as legacy control points to ensure the newly generated data properly integrated with its historic database.

Lake Worth Drainage District E-3 Canal Rehab

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided canal right-of-way mapping and staking services for approximately 20 miles of canals as part of the Lake Worth Drainage District Canal Rehabilitation Program. The project consisted of staking the right-of-way lines along several Lake Worth Drainage District canals.