Missouri Platte River Flooding

Posted on May 3rd, 2024 by Jillian Taylor

Our team performed all imagery acquisition and processing as well as most of the LiDAR acquisition (approximately 3,100 square miles) for this project. In order to enable capture of peak flood conditions, typical orthoimagery acquisition specifications for no clouds or haze, etc. were not required for this project.

Jefferson City Tornado Disaster Mapping

Posted on April 19th, 2024 by Ji Lee

On May 22, 2019, an EF-3 tornado hit Jefferson City, MO. Within a few hours, several geospatial entities within the state established a data acquisition plan. Because of the emergency nature of this project, it was essential to provide data as quickly as possible to assist first responders in relief and recovery activities.

City of Albuquerque International District Library

Posted on March 27th, 2024 by Jillian Taylor

Our team was extensively involved in the planning and design for a proposed City of Albuquerque library. The project site encompasses two city blocks of property divided by a public city street. The property was previously developed with a night club and pawn shop which have since been demolished to make way for the new construction.

Las Cruces I-25 Study Corridor

Posted on March 27th, 2024 by Jillian Taylor

Our role included subsurface utility engineering quality levels B, C and D along approximately seven miles of I-25 right-of-way from the Dona Ana Interchange south to Lohman Avenue, with an additional seven miles of densely populated utility corridors beneath several arterial roadways and interchanges.

New Mexico Behavioral Health Institute (NMBHI)

Posted on March 27th, 2024 by Jillian Taylor

Our team provided subsurface utility engineering, professional surveying, civil engineering and UAV services to support the planning, design and construction of a new fully redundant optical fiber campus technology loop for the roughly 100 acre developed portion of the state’s campus in Las Vegas, NM.

Los Altos Park Renovation

Posted on March 25th, 2024 by Jillian Taylor

Our team provided subsurface utility engineering, professional surveying, civil engineering, and UAV services to support the planning, design and construction of a major city park renovation to an approximately 40-acre existing public facility in Albuquerque, NM.

Rockcliff Energy Saltwater Gathering System

Posted on February 28th, 2024 by Jillian Taylor

Bowman partnered with Rockcliff Energy to conduct a preliminary survey and perform construction staking for an 88-mile saltwater gathering system. This system, designed to enhance the efficiency of saltwater disposal in midstream operations, aimed to eliminate the dependence on conventional 18-wheeler disposal methods.

Preliminary Survey for Natural Gas Gathering System

Posted on February 28th, 2024 by Jillian Taylor

Bowman secured a contract to conduct a preliminary survey for a 55-mile gas gathering pipeline, which is designed to gather natural gas from several well locations and transports it to a liquefied natural gas (LNG) plant in Southwest Louisiana.

Pipeline Integrity Support

Posted on February 28th, 2024 by Jillian Taylor

Bowman was contracted to provide integrity support services for 41 miles of pipeline across East Texas and Northwest Louisiana. To ensure the reliability and safety of the energy infrastructure, our team conducted depth of cover surveys to assess the position of pipelines beneath the surface.

Gas Gathering Collection System Survey

Posted on February 28th, 2024 by Jillian Taylor

Bowman was engaged to provide open ditch as-built surveys for 315 miles of natural gas gathering systems. Bowman not only provided an accurate representation of the existing infrastructure but also served as a valuable resource for future maintenance, expansion and regulatory compliance.