Calumet

Posted on September 15th, 2020 by Renee Narvaez

Bowman team designed and planned a 900 plus unit residential subdivision as well as public road and utility infrastructure. The team was challenged with creating a site sensitive design while maximizing the total allowable dwelling units all while balancing community buy in with the town residence and adjacent neighbors.

Cape Canaveral Air Force Station Fire Water Line Repair

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided site constriction survey and stakeout support for an active drilling operation consisted of four directional drill sites and approximately 9,300 LF of fire suppression transmission water line. The team was required to provide near real time analysis of alignments and adjust to various site conditions and client constraints.

Cadiz to Hopedale Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning and surveying services to design a complex extension of multiple large pipelines. The project was further challenged by sensitive environmental areas, tight easements, existing infrastructure, and ongoing mining activities.

Ballpark Village

Posted on September 15th, 2020 by Renee Narvaez

A Planned Area Development was previously approved for the stadium, practice facilities and basic infrastructure, which are currently in operation. The remaining parcels of land surrounding the facilities remain vacant. Bowman provided engineering and surveying services to support a proposed land use change from intense office to medium- and high-density residential for 60 acres of property in the southern portion of the project.

Block 37 Site Improvements

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering services and preparation of construction documents in conjunction with the de-velopment of a mixed-use retail/entertainment, CTA transit station, office and retail project. The project consisted of approximately 400,000 sq. ft. above-grade retail and entertainment uses housed on four levels and approximately 100,000 sq. ft. of Class A office building housing a new 17-story facility for CBS Broadcasting.

Bluestone to Sunoco Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, survey, and design services included pipeline and right-of-way design, project coordination with routing, land agents, environmental, archeological, and geotechnical sub-consultants, construction and surveying, and preparation of construction documents including major horizontal drilling designs for numerous interstate highway, road and railroad crossings, creeks and wetlands.

Ballie Trust Pipeline

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided its core planning, survey, and design services to deliver a pipeline expansion project on a very tight deadline. The team had to navigate environmental sensitive areas, state and federal permitting requirements, endangered animals, and changing landowner consents.

Blackstone

Posted on September 15th, 2020 by Renee Narvaez

This Lennar community of 232 single family homes is situated adjacent to the prestigious Blackstone Country Club. Bowman reprocessed all entitlements which had expired for this legacy community. Construction documents included extensive coordination with the existing golf course and design of a hilltop playground and recreation area.

Bastrop Co. Complex Fire Recovery Program

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided project management services which included direct administration and manage-ment of a significant portion of the Department of Housing and Urban Development’s Community De-velopment Block Group grant for Disaster Recovery awarded through the Texas General Land Office for the non-housing allocation of the CDBG-DR grant, in conjunction with an Emergency Watershed Protection grant from the Natural Resource Conservation Service.

Bickford South Eby Senior Living Facility

Posted on September 15th, 2020 by Renee Narvaez

Bowman performed due diligence and land use entitlement services for this 60-unit senior living facility including boundary and topographic surveys, due diligence and preliminary engineering, a preliminary traffic assessment, final site plan preparation and construction plans, and land acquisition transaction services, including an ALTA/ACSM Land Title survey, lead and asbestos survey, easement plats, VSMP General Permit and SWPPP, and subdivision platting.