Aiken Chapel Road Realignment

Posted on February 7th, 2024 by Jillian Taylor

Our team designed and permitted the intersection improvements of Aiken Chapel Road at Beeks Road located in Taylors, SC for Greenville County. The intersection improvements are intended to improve traffic flow & stormwater drainage while still providing necessary access to facilities in the area.

Cayce Riverwalk Stabilization and Pedestrian Bridge

Posted on February 7th, 2024 by Jillian Taylor

The City of Cayce was hit hard by Hurricane Joaquin in 2015. The City’s Riverwalk was demolished by flooding and had closed the pedestrian areas to keep citizens safe. Our professional engineers designed a slope stabilization plan and provided hydraulic calculations.

I-95 Emergency 3D Scanning

Posted on January 22nd, 2024 by Jillian Taylor

Our team was retained by the South Carolina Department of Transportation, District 5 to perform emergency 3D laser scanning surveys on a ¾ mile segment of Interstate 95 running northerly from the I-95/I-20 Interchange.

San Gabriel River Commuter Bikeway Project

Posted on January 5th, 2024 by Jillian Taylor

This project involved engineering design services for a 2.5-mile class I bicycle and pedestrian path. The entire project is built on rights-of-way controlled by the city, Los Angeles County Department of Public Works, Los Angeles County Flood Control District and Caltrans.

Lincoln Park Improvement Project

Posted on January 5th, 2024 by Jillian Taylor

Our team provided plans, specifications and estimates (PS&E) for Lincoln Park Entrance at the Broadway intersection in the City of Anaheim.

Marstons Mills Village Center Improvements

Posted on December 30th, 2023 by Jillian Taylor

Our project team was retained by the Town of Barnstable to design intersection and roadway improvement plans for Marstons Mills Village Center along the Cotuit Road (Route 149) corridor.

Coney Street Improvements, Phases I & II

Posted on December 30th, 2023 by Jillian Taylor

Retained by the Town of Walpole to design intersection and roadway improvements on Coney Street and to prepare construction documents for bidding. The primary goal of the project was to provide vehicular, pedestrian and bicycle improvements along Coney Street, using a MassWorks funding grant.

Intersection Improvements at Springdale Road

Posted on December 30th, 2023 by Jillian Taylor

Our project team was retained by the City of Westfield to design intersection and roadway improvements on Union Street at the intersection of Springdale Road and Papermill Road and prepare construction plans and contract documents for bidding.

I-78 Krumsville Interchange ITS

Posted on December 30th, 2023 by Jillian Taylor

Our team prepared ITS plans for the installation of two DMS and removal, temporary replacement, and relocation of one CCTV Camera, one HAR flashing beacon sign, and one HAR Transmitter. We also completed partial interchange lighting design for the new interchange. 

SR 0061 Pottsville Pike and Tuckerton Road

Posted on December 29th, 2023 by Jillian Taylor

The project started with preliminary engineering for PennDOT District 5-0 in 2010. There were several phases of the project in engineering, including an alternatives analysis, preliminary engineering, environmental clearance, and final design prior to the project advancing into construction.