Cayce Riverwalk Stabilization and Pedestrian Bridge

Posted on February 7th, 2024 by Jillian Taylor

The City of Cayce was hit hard by Hurricane Joaquin in 2015. The City’s Riverwalk was demolished by flooding and had closed the pedestrian areas to keep citizens safe. Our professional engineers designed a slope stabilization plan and provided hydraulic calculations.

Marstons Mills Village Center Improvements

Posted on December 30th, 2023 by Jillian Taylor

Our project team was retained by the Town of Barnstable to design intersection and roadway improvement plans for Marstons Mills Village Center along the Cotuit Road (Route 149) corridor.

Coney Street Improvements, Phases I & II

Posted on December 30th, 2023 by Jillian Taylor

Retained by the Town of Walpole to design intersection and roadway improvements on Coney Street and to prepare construction documents for bidding. The primary goal of the project was to provide vehicular, pedestrian and bicycle improvements along Coney Street, using a MassWorks funding grant.

Intersection Improvements at Springdale Road

Posted on December 30th, 2023 by Jillian Taylor

Our project team was retained by the City of Westfield to design intersection and roadway improvements on Union Street at the intersection of Springdale Road and Papermill Road and prepare construction plans and contract documents for bidding.

I-78 Krumsville Interchange ITS

Posted on December 30th, 2023 by Jillian Taylor

Our team prepared ITS plans for the installation of two DMS and removal, temporary replacement, and relocation of one CCTV Camera, one HAR flashing beacon sign, and one HAR Transmitter. We also completed partial interchange lighting design for the new interchange. 

SR 0061 Pottsville Pike and Tuckerton Road

Posted on December 29th, 2023 by Jillian Taylor

The project started with preliminary engineering for PennDOT District 5-0 in 2010. There were several phases of the project in engineering, including an alternatives analysis, preliminary engineering, environmental clearance, and final design prior to the project advancing into construction.

SR 0415 Memorial Highway, Dallas 5-leg Intersection

Posted on December 28th, 2023 by Jillian Taylor

Our firm was retained by PennDOT for the preliminary engineering and final design of the $3.5M “Dallas 5-Leg” intersection improvement project. This project was identified as a “high priority” project in the Back Mountain Area Council of Government’s Transportation Plan.

Kirk Road Reconstruction and Utility Relocation

Posted on December 12th, 2023 by Jillian Taylor

Our team is currently preparing roadway design plans for the reconstruction of an 0.8-mile roadway segment on Kirk Road, from Summit Boulevard to Gun Club Road, in Unincorporated Palm Beach County.

Challenger Boulevard at Winkler Avenue Project

Posted on December 12th, 2023 by Jillian Taylor

Since 2003, our firm has been a transportation consultant to the City of Fort Myers on multiple, consecutive contracts that have precipitated numerous design, planning, and traffic engineering projects. Our team has carried the Challenger Boulevard at Winkler Avenue project from study/conception to final design.

NW 31st Avenue Roadway Reconstruction LAP/JPA Project

Posted on December 12th, 2023 by Jillian Taylor

Our team prepared design plans for a half-mile segment of NW 31st Avenue, from NW 39th Street to NW 44th Street. The City initiated this LAP/JPA (Joint Permit Application) project to implement complete streets, particularly to provide sidewalk along the east side, providing safer pedestrian access to transit stops.