New SX Settlers Feasibility Engineering

Posted on July 3rd, 2024 by Renee Narvaez

Based on previous wash settler design experience, Bowman was uniquely qualified to do a feasibility study (FS) design for a new solvent extraction (SX) plant at a different operation for the Sierrita Mine. The project required a closely coordinated team of process, mechanical, civil, structural and electrical engineers. Bowman successfully integrated Plant 3D, Revit and […]

Hayden AB-BC TSF Decant System

Posted on July 3rd, 2024 by Renee Narvaez

Bowman provided construction engineering services. Because of changes in the planned use of the AB-BC Tailings storage facility, the diameter of the slurry distribution pipes were reduced from 18” to 12”. This and other changes were implemented in the pump set ups. These changes resulted in overall improved decant system efficiency.

Dysart Unified School District

Posted on May 28th, 2024 by Renee Narvaez

Topographic survey, civil site design, construction services, and construction staking for a new district vehicle support facility on a 26 acre site. The facility has concrete parking for 200 buses, a warehouse and District support and training building.

Seward South

Posted on March 26th, 2024 by Renee Narvaez

This 5 span, 180’-0” long bridge replacement project included a bridge over the Blue River on the south edge of Seward, Nebraska. This cast in-place concrete slab bridge was designed to handle the frequent flooding of the Blue River.

Road P32

Posted on March 26th, 2024 by Renee Narvaez

Just 4 miles south of the proposed Blair South Bypass, our team designed two miles of grading, culverts, 9″ doweled concrete pavement and erosion control. This county funded project was built under the NDOT standard specifications.

Blue River Bridge

Posted on March 26th, 2024 by Renee Narvaez

In this urban bridge project spanned the Blue River in Crete, NE. Our team performed the survey, design and construction inspection and administration of two bridges, storm sewer, concrete paving, environmental monitoring, seeding and erosion control.

27th/Fairfield & West ‘O’ Street Bridge

Posted on March 26th, 2024 by Renee Narvaez

Our team designed and provided construction management and construction inspections services for this federally funded project let by the NDOT. This project consisted of rehabilitating two bridges over Salt Creek in Lincoln, NE. The 2 bridges, one on 27th street and the other on West ‘O’ Street required several repairs.

Naper South

Posted on March 26th, 2024 by Renee Narvaez

Due to flood damage in March of 2019, our team was hired to design and oversee construction of this replacement bridge. This bridge was designed and constructed in 3 years.

Sports Complex at John Anson Ford Park

Posted on January 5th, 2024 by Jillian Taylor

The Bell Gardens Sports Complex is located at the John Anson Ford Park, a major regional park facility in the City of Bell Gardens. We were tasked with designing and managing the construction of the new sports facilities, which replaced an old park that was dilapidated and functionally outdated.

Edison Multi-Family

Posted on December 4th, 2023 by Renee Narvaez

Our team was contracted to provide land surveying, civil design services, construction administration and construction staking for an apartment housing project containing 232 units – six story apartment building with a parking garage on the first floor.