Seward South

Posted on March 26th, 2024 by Jillian Taylor

This 5 span, 180’-0” long bridge replacement project included a bridge over the Blue River on the south edge of Seward, Nebraska. This cast in-place concrete slab bridge was designed to handle the frequent flooding of the Blue River.

Road P32

Posted on March 26th, 2024 by Jillian Taylor

Just 4 miles south of the proposed Blair South Bypass, our team designed two miles of grading, culverts, 9″ doweled concrete pavement and erosion control. This county funded project was built under the NDOT standard specifications.

Blue River Bridge

Posted on March 26th, 2024 by Jillian Taylor

In this urban bridge project spanned the Blue River in Crete, NE. Our team performed the survey, design and construction inspection and administration of two bridges, storm sewer, concrete paving, environmental monitoring, seeding and erosion control.

27th/Fairfield & West ‘O’ Street Bridge

Posted on March 26th, 2024 by Jillian Taylor

Our team designed and provided construction management and construction inspections services for this federally funded project let by the NDOT. This project consisted of rehabilitating two bridges over Salt Creek in Lincoln, NE. The 2 bridges, one on 27th street and the other on West ‘O’ Street required several repairs.

Naper South

Posted on March 26th, 2024 by Jillian Taylor

Due to flood damage in March of 2019, our team was hired to design and oversee construction of this replacement bridge. This bridge was designed and constructed in 3 years.

Los Altos Park Renovation

Posted on March 25th, 2024 by Jillian Taylor

Our team provided subsurface utility engineering, professional surveying, civil engineering, and UAV services to support the planning, design and construction of a major city park renovation to an approximately 40-acre existing public facility in Albuquerque, NM.

Rockcliff Energy Saltwater Gathering System

Posted on February 28th, 2024 by Jillian Taylor

Bowman partnered with Rockcliff Energy to conduct a preliminary survey and perform construction staking for an 88-mile saltwater gathering system. This system, designed to enhance the efficiency of saltwater disposal in midstream operations, aimed to eliminate the dependence on conventional 18-wheeler disposal methods.

Preliminary Survey for Natural Gas Gathering System

Posted on February 28th, 2024 by Jillian Taylor

Bowman secured a contract to conduct a preliminary survey for a 55-mile gas gathering pipeline, which is designed to gather natural gas from several well locations and transports it to a liquefied natural gas (LNG) plant in Southwest Louisiana.

Pipeline Integrity Support

Posted on February 28th, 2024 by Jillian Taylor

Bowman was contracted to provide integrity support services for 41 miles of pipeline across East Texas and Northwest Louisiana. To ensure the reliability and safety of the energy infrastructure, our team conducted depth of cover surveys to assess the position of pipelines beneath the surface.

Gas Gathering Collection System Survey

Posted on February 28th, 2024 by Jillian Taylor

Bowman was engaged to provide open ditch as-built surveys for 315 miles of natural gas gathering systems. Bowman not only provided an accurate representation of the existing infrastructure but also served as a valuable resource for future maintenance, expansion and regulatory compliance.