Preliminary Survey for Natural Gas Gathering System

Various Locations, TX, LA

Bowman secured a contract to conduct a preliminary survey for a 55-mile gas gathering pipeline, which is designed to gather natural gas from several well locations and transports it to a liquefied natural gas (LNG) plant in Southwest Louisiana.

The comprehensive survey included analysis of terrain, well locations and route optimization. These data points were essential to the success of the gathering and transportation pipeline, exampling Bowman’s commitment to tailored solutions in the energy sector.