Hurricane Creek Bridge Replacement

Posted on February 7th, 2024 by Jillian Taylor

Deep in the woods of the Great Pee Dee River Heritage Preserve was a bridge that was on the verge of failure due to high water events, a build of debris, and age. Our team worked with SCDNR to design a solution that would solve many of the site’s issues.

Hill Street Repaving and Improvements

Posted on February 7th, 2024 by Jillian Taylor

Our team has designed and permitted the repaving and improvements of Hill Street from Sumter Ave to Marion Ave located in Fort Jackson, SC. The improvements are intended make the road safer for pedestrians and offer better parking for buildings in the area.

City of Chester Streetscape Rehabilitation

Posted on February 7th, 2024 by Jillian Taylor

Our team was hired by the City of Chester to provide a master plan for rehabilitation work along Main Street and Gadsen Street including replacing trees, resetting pavers, replacing concrete sidewalk and repairing asphalt pavement.

Aiken Chapel Road Realignment

Posted on February 7th, 2024 by Jillian Taylor

Our team designed and permitted the intersection improvements of Aiken Chapel Road at Beeks Road located in Taylors, SC for Greenville County. The intersection improvements are intended to improve traffic flow & stormwater drainage while still providing necessary access to facilities in the area.

Cayce Riverwalk Stabilization and Pedestrian Bridge

Posted on February 7th, 2024 by Jillian Taylor

The City of Cayce was hit hard by Hurricane Joaquin in 2015. The City’s Riverwalk was demolished by flooding and had closed the pedestrian areas to keep citizens safe. Our professional engineers designed a slope stabilization plan and provided hydraulic calculations.

I-95 Emergency 3D Scanning

Posted on January 22nd, 2024 by Jillian Taylor

Our team was retained by the South Carolina Department of Transportation, District 5 to perform emergency 3D laser scanning surveys on a ¾ mile segment of Interstate 95 running northerly from the I-95/I-20 Interchange.

Clemson University Football Operations Facility

Posted on October 5th, 2023 by Ji Lee

Clemson University retained our team to perform an independent, third-party review of the performance-based design analysis. The team also assisted Clemson University with gaining the South Carolina Office of the State Engineer’s acceptance of the performance-based design.

Federal Aviation Administration, ATCT Life Safety Assessments

Posted on October 4th, 2023 by Ji Lee

At over 65 locations throughout the eastern United States, our team designed modifications to air traffic control towers’ (ATCT) fire and life safety systems in order to comply with new OSHA standards and FAA criteria.

Harleville Hydrogeologic Investigation

Posted on August 25th, 2023 by Jillian Taylor

Bowman geologists/hydrogeologists were responsible for the implementation of a groundwater investigation relative to a proposed quarry deepening.

AutoZone

Posted on April 8th, 2022 by Suede

For the last eight years, our North Carolina team has been awarded over 60 contracts spanning across North Carolina, South Carolina and Virginia to provide civil / site engineering services. While each project had its own set of challenges, the team maintained consistency while exceeding the client’s expectations and staying within budget.