Greatrock Reverse Osmosis Water Treatment Plant

Posted on July 12th, 2024 by Jillian Taylor

The Greatrock North Water and Sanitation District retained our team to address its aging and failing reverse osmosis water treatment plant. The existing plant designed and built by the original developer had a capacity of 100 gpm and could not keep up with the desired capacity or the district’s water quality targets.

Edgemont Ranch Metropolitan District Wastewater

Posted on July 12th, 2024 by Jillian Taylor

The Edgemont Ranch Metropolitan District was issued new, strict TIN, TN and TP limits that rendered their lagoon obsolete. As a remedy, the district looked to the BIOCOS technology, a hybrid activated sludge system to deliver more thorough treatment, consisting of two aeration tanks hydraulically connected to an alternating pair of sludge recycling and settling tanks.

Del Norte Collection System Improvements

Posted on July 12th, 2024 by Jillian Taylor

The Town of Del Norte’s collection system had significant structural issues including collapsed clay pipes, cracks, and offset joints. Our team was retained by the town to assess, plan, fund, design, bid and provide construction administration for a system-wide collection system improvement project.

Center Sanitation District

Posted on July 12th, 2024 by Jillian Taylor

Center Sanitation District was struggling for years with a non-compliant lagoon system. The existing facility had chronic BOD, TIN, and E. Coli violations of their groundwater discharge permit. Our team was tasked with creating a long-term financially sustainable solution for the district that didn’t break the bank.

Long Beach Blvd. Improvement Project

Posted on October 23rd, 2023 by Jillian Taylor

Our team provided construction management, inspection, and labor compliance for the resurfacing of 192,779 sq. ft. of roadway in Lynwood, CA. Other activities included renovating sidewalks, driveway approaches, curbs and gutters and constructing six new bus pads.

Downtown Beautification Project

Posted on October 19th, 2023 by Jillian Taylor

The scope of work included replacing existing streetlight and traffic signal infrastructure with new decorative infrastructure designed to identify and create visual points of interest that highlight and activate the Baldwin Park community.

Lawyers Mall Underground Infrastructure

Posted on July 6th, 2023 by Amy Talton

The project is a multi-phased project to replace aged underground infrastructure utility systems (steam, chilled water, water, storm water, gas, electricity, and IT/data telecommunications) that sustain historic state buildings, including the House of Delegates Building and the three buildings (Legislative, State House, and Governor’s House) that make up Lawyer’s Mall.

Ferry Street Improvements

Posted on June 11th, 2022 by Jillian Taylor

A roadway and intersection improvements with a mini roundabout. Included pedestrian, bicycle, and parking improvements using a shared-use path, pedestrian crossings and new parking areas. The design improved the connection to the existing City Rail Trail. The drainage system was upgraded, lighting added, utilities were improved, and landscape and streetscape beautified the area.

Loxahatchee River District Force Main Replacement

Posted on September 28th, 2020 by editor@bowman

Bowman recently provided Subsurface Utility Engineering services for Olympus Drive force main replacement design in Juno Beach within US Highway 1 and Ocean Drive, along Olympus Drive and Celestial Way.

Floresta Drive Design Survey

Posted on September 28th, 2020 by editor@bowman

Bowman is a subconsultant for the City of Port St. Lucie Floresta Drive Corridor to provide utility infrastructure investigation (ASCE Quality Level B) to identify the horizontal location of existing utilities within the project area.