West Palm Beach Bike Master Plan

Posted on June 8th, 2022 by editor@bowman

The Citywide Bicycle Master Plan for the City of West Palm Beach included an extensive public outreach process and agency coordination. The master plan provides a guide to the city regarding bicycle corridors, ultimate bicycle facilities and appropriate treatments to elevate the city that requires minimal motorized transportation.  

FDOT Traffic Operations Safety Studies

Posted on June 8th, 2022 by editor@bowman

As a consultant on this task order-based contract, the team performs work and is responsible for managing sub-consultant teams in the preparation and submittal of various types of traffic studies and assessments. This includes safety studies, qualitative assessments, signal warrant analyses, intersection analyses, arterial analyses, left‐turn phase warrant analyses, supplemental tasks and fatal crash reviews.  

City of Fort Myers Bicycle & Pedestrian Master Plan

Posted on June 8th, 2022 by editor@bowman

City of Fort Myers Bicycle & Pedestrian Master Plan is part of an ongoing general planning consulting contract for the Lee County MPO. Efforts included an extensive inventory of existing bicycle and pedestrian facilities, literature research, a needs assessment, agency coordination, and a robust public outreach process.

South Fry Road Beautification

Posted on April 29th, 2022 by editor@bowman

Our landscape team beautified the public right-of-way south of IH-10 by designing an irrigated streetscape with accent walls, planter pots, street trees and pedestrian lighting. This made the area more inviting for residents and businesses, winning the project an award from the Texas Association of Water Board Directors.

Harris County 911 Call Center

Posted on April 29th, 2022 by editor@bowman

Our team provided landscape architecture services for the Harris County 911 Call Center site in Houston, Texas. Services provided include schematic design, design development, construction documents and construction phase services. The project scope included hardscape design, site furnishings, outdoor gym and LID components, including bioswales. This project achieved LEED certification.

Paul Duke STEM High School

Posted on March 11th, 2022 by editor@bowman

The team coordinated and assisted site design, construction documentation, stormwater management, hydrology, permitting and construction administration for this new 300,000 sq. ft., STEM high school for Gwinnett County Public Schools.

Rock Springs Park

Posted on March 11th, 2022 by editor@bowman

Park programming for this 120-acre park consisted of a three-field, sodded, lighted, fenced, irrigated soccer pitch area, dog park areas, and a large concession/restroom building and plaza area. The project also required the design and implementation of a new park entrance with all associated lighting.

E. E. Robinson Park

Posted on March 11th, 2022 by editor@bowman

A 67-acres park and nature area contained multiple streams, steep slopes, mature landmark trees and beautiful vistas. The county planned to program the park with a multi-purpose field complex, structured picnic area, nature trail with wayfinding and nature kiosks, multiple pavilions and a large playground complex.

Alexander Park

Posted on March 11th, 2022 by editor@bowman

Provided landscape architecture and civil design for this 91-acre park that included an informal terraced amphitheater, an 18-hole disc golf course, two miles of paved multi-use trails, a one-mile natural cross country trail, pedestrian plaza, playground, pond fishing piers, an outdoor classroom and multiple pavilions and buildings.

Discovery Park

Posted on March 10th, 2022 by editor@bowman

Gwinnett County Community Park’s master plan program includes a multi-use field complex, playground/splashpad complex, a play courts area with three-on-three soccer/basketball/volleyball, a four-square setup and outdoor ping pong. A 1.5-mile perimeter multi-use trail (for walking and bicycling) encompasses the park and connects all use areas.