Greatrock Reverse Osmosis Water Treatment Plant

Posted on July 12th, 2024 by sl-dev

The Greatrock North Water and Sanitation District retained our team to address its aging and failing reverse osmosis water treatment plant. The existing plant designed and built by the original developer had a capacity of 100 gpm and could not keep up with the desired capacity or the district’s water quality targets. The district’s raw […]

Edgemont Ranch Metropolitan District Wastewater

Posted on July 12th, 2024 by sl-dev

The Edgemont Ranch Metropolitan District was issued new and very strict TIN, TN and TP limits that rendered their lagoon system obsolete. Edgemont Ranch lies in the watershed of the Florida River, a tributary of the Animas River. Downstream of the treatment facility are agricultural irrigation reservoirs that experienced algae blooms. Because lagoon-based systems are […]

Del Norte Collection System Improvements

Posted on July 12th, 2024 by sl-dev

The Town of Del Norte’s collection system had significant structural issues including collapsed clay pipes, cracks, and offset joints. This caused significant inflow and infiltration (groundwater/runoff) into the collection system, sometimes as much as doubling or tripling the normal influent wastewater flow to the wastewater treatment plant. This significantly affected the treatment facility’s ability to […]

Center Sanitation District

Posted on July 12th, 2024 by sl-dev

Center Sanitation District was struggling for years with a non-compliant lagoon system. The existing facility had chronic BOD, TIN, and E. Coli violations of their groundwater discharge permit. The district was issued a Notice of Violation Cease and Desist Order for the length and severity of these violations. Our team was tasked with creating a […]

Downtown Beautification Project

Posted on October 19th, 2023 by Jillian Taylor

The scope of work included replacing existing streetlight and traffic signal infrastructure with new decorative infrastructure designed to identify and create visual points of interest that highlight and activate the Baldwin Park community.

Lawyers Mall Underground Infrastructure

Posted on July 6th, 2023 by Amy Talton

The project is a multi-phased project to replace aged underground infrastructure utility systems (steam, chilled water, water, storm water, gas, electricity, and IT/data telecommunications) that sustain historic state buildings, including the House of Delegates Building and the three buildings (Legislative, State House, and Governor’s House) that make up Lawyer’s Mall.

Ferry Street Improvements

Posted on June 11th, 2022 by Renee Narvaez

A roadway and intersection improvements with a mini roundabout. Included pedestrian, bicycle, and parking improvements using a shared-use path, pedestrian crossings and new parking areas. The design improved the connection to the existing City Rail Trail. The drainage system was upgraded, lighting added, utilities were improved, and landscape and streetscape beautified the area.

Loxahatchee River District Force Main Replacement

Posted on September 28th, 2020 by editor@bowman

Bowman recently provided Subsurface Utility Engineering services for Olympus Drive force main replacement design in Juno Beach within US Highway 1 and Ocean Drive, along Olympus Drive and Celestial Way.

Floresta Drive Design Survey

Posted on September 28th, 2020 by editor@bowman

Bowman is a subconsultant for the City of Port St. Lucie Floresta Drive Corridor to provide utility infrastructure investigation (ASCE Quality Level B) to identify the horizontal location of existing utilities within the project area.

Windsor Water System Mapping

Posted on September 28th, 2020 by editor@bowman

To convert existing CAD data and hard copy maps of the water distribution system into a GIS framework, Bowman identified the water distribution system features including mains, valves, storage tanks, wells, services, meters, and fire hydrants.