Red Tailed Hawk

Posted on August 3rd, 2022 by editor@bowman

Performed surveying services for approximately 2,800 acres of Wharton County outside of Houston, TX. The scope consisted of an aerial survey to collect orthoimagery and an on-the-ground boundary survey to produce ALTA surveys for all project area. Bowman’s team of professional surveyors in Texas marked out points and lines of any significant features found in the field and after in-depth title work.

Parliament

Posted on July 29th, 2022 by editor@bowman

Performed surveying services for approximately 3,400 acres located in Waller County outside of Houston, TX. The scope included an aerial survey to collect orthoimagery and an on-the-ground boundary survey to produce ALTA surveys for all project area. Bowman’s team of professional surveyors marked out points and lines of any significant features found in the field and after in-depth title work.

Whole Foods Rooftop Solar

Posted on September 15th, 2020 by editor@bowman

Bowman provided surveying services for six Whole Foods Markets sites across Florida. Bowman prepared a topographic survey to provide the basis for the final array layout. Bowman recorded the dimensions of the roof inside of the parapets; the height of the parapet off of the roof deck every 20 feet or where vertical changes occurred.

Hanover Cross Roads Solar Field

Posted on September 15th, 2020 by editor@bowman

Bowman provided engineering services to provide over 52,000 sq. ft. of roof top solar panels and 17,000 sq. ft. of ground-mounted solar panels to a new shopping center.

ERM Solar City

Posted on September 15th, 2020 by editor@bowman

Bowman performed various services for the proposed 1099 kW solar array: New Solar Field, 4 AC, Greenport, NY – surveying and site plan preparation including boundary survey research of 4 acres. Carnegie Center Solar Canopy Project, West Windsor, NJ – surveying and site plan preparation on 4 Sites.

Cople Elementary School Solar Project

Posted on September 15th, 2020 by editor@bowman

5-acre 2,100 solar panel array located on existing Elementary School property produces 1.2 megawatts a year, offset-ting the facilities carbon footprint by 865 tons of CO2. This project is part of a Power Purchase Agreement with Sun-Tribe Solar which resulted in no investment from the County and estimated to save $3.6 million over the solar array’s lifespan. Bowman provided comprehensive engineering and surveying services.

Connell Solar L’Oreal Headquarters

Posted on September 15th, 2020 by editor@bowman

Bowman obtained land use approvals for this LEED Gold Certified headquarters. The project sits on 12.83 acres and included the installation of over 21,000 sq. ft. of rooftop solar panels and 91,000 sq. ft. of parking lot canopy solar panels. Bowman performed initial due diligence research of municipal zoning, site plans, and coordination through the approval process.

Desert Wind Farm

Posted on September 15th, 2020 by editor@bowman

Bowman provided a variety of survey services to support the development of a proposed 150 turbine, 330-megawatt wind farm. The team was responsible for preparing and recertification for ALTA surveys and pos construction as-builts.

Bradley and Carter Solar Farm

Posted on September 15th, 2020 by editor@bowman

Bowman prepared ALTA/ACSM surveys, detailed topographic survey including necessary road frontage surveying. Approximately 25 acres of topography were required on the Bradley farm site, and approximately 35 acres of topography were required on the Carter farm site, as a minimum 75-foot overlap around the perimeter.

Bowen Solar Farm

Posted on September 15th, 2020 by editor@bowman

Bowman provided a detailed topographic survey and preliminary engineering services to facilitate initial discussions with Calvert County officials and included a concept plan to illustrate the improvements relating to the proposed solar panels.