Groundwater Investigation and Monitoring Plan

Posted on August 25th, 2023 by Jillian Taylor

Bowman prepared a groundwater work plan and implemented a groundwater investigation. The purpose of the investigation was to address the karstic terrain surrounding the 300-acre cement quarry.

Mine Water Infiltration Study

Posted on August 23rd, 2023 by Jillian Taylor

Bowman directed a $2M program to design and construct a series of liner systems in the Bushkill Stream which borders Hercules Cement’s Stockertown Quarry. Water from the stream historically leaked into the quarry through karstic features with required expensive dewatering efforts.

San Diego State University, Snapdragon Stadium

Posted on January 12th, 2023 by Ji Lee

Our team was selected to lead the design team for San Diego State University (SDSU) in building a world-class university campus, research center and multi-use stadium in Mission Valley. The project will serve higher education, the public good and the community’s goals and aspirations.

Petco Park

Posted on September 28th, 2022 by editor@bowman

Provided civil engineering, construction survey, and environmental planning on the new Padres ballpark (Petco Park). As the lead civil engineer on the project, we provided a broad range of services including hardscape plans for the utilities to serve the ballpark and surrounding five plazas and streets; land use studies; cost estimates; construction-staking surveying; and construction management.

Dunaway Water Treatment Facility

Posted on September 14th, 2022 by editor@bowman

Our team of experts provided complete civil engineering and surveying services for design, preparation of construction plans and specifications, and permitting, bidding, and construction inspection and administration of a new Water Treatment Plant and stormwater management pond at the Dunaway well site for ECUA.

Sycamore Creek Sanitary Sewer Relief Interceptor, Phase III

Posted on August 29th, 2022 by editor@bowman

Our team completed the design survey of approximately 6,700 LF for the purpose of a new sanitary sewer relief interceptor in the City of Fort Worth. The proposed alignment for this project traversed through a city park, crossed US Highway 287, Sycamore Creek, and public right-of-way.

North Texas Municipal Water District McKinney East Side Water Line

Posted on August 26th, 2022 by editor@bowman

Our team completed the aerial and LiDAR survey for a proposed 5 mile water line in McKinney, Texas. We managed the collection of aerial photogrammetry and LiDAR using a helicopter with a single pass and extracted planimetrics and a digital terrain model with one ft contours.

Kilgore Surface Water Treatment Plant

Posted on August 26th, 2022 by editor@bowman

Our team completed the design survey for a new high service pump station to replace the existing high service pumping facility at the Kilgore Surface Water Treatment Plant. We set project control throughout the site and utilized their unmanned aerial vehicle (UAV) to survey the existing structures, ground features, and create a point cloud, video, and digital terrain model of the site.

Jonah Water Special Utility District

Posted on August 26th, 2022 by editor@bowman

Our team completed the boundary and topographic survey of 10.2 miles for a proposed 24-in waterline from the Circleville Pump Station to the Jonah Special Utility District headquarters located in Williamson County.

Beck Branch Sanitary Sewer Interceptor

Posted on August 4th, 2022 by editor@bowman

Our team was hired to perform the design survey of approximately 19,000 LF for the purpose of a new sanitary sewer line in the City of Plano. First we established control points and benchmarks at 1,000-ft intervals. Horizontal coordinates were established using GPS and vertical values were established by conventional leveling.