Middlesex Regional Water System

Posted on September 15th, 2020 by editor@bowman

Bowman is assisting the Middlesex Water Authority with developing a regional water system in lower Middlesex County. Due to poor groundwater quality in the individual shallow wells throughout the eastern portion of the County, the MWA has sought to develop a regional water system to serve the entire eastern section of the County. This effort […]

Monterray Waterway C24 Canal

Posted on September 15th, 2020 by Suede

Bowman provided emergency design services to retrofit critical storm structures following Hurricane Katrina and worked closely with the City of Port St. Lucie to provide assistance in expediting a solution to a destroyed water retention berm.

Maple Avenue

Posted on September 15th, 2020 by editor@bowman

Bowman provided planning and design services to the Town of Vienna for the Maple Avenue project. Bowman’s scope of services includes approximately a mile of comprehensive streetscape enhancement, pedestrian improvements, significant overhead utility undergrounding, storm drain utility analysis and design, a full topographic and property survey, and comprehensive easement and entitlement services.

Lake Worth Drainage District E-3 Canal Rehab

Posted on September 15th, 2020 by editor@bowman

Bowman provided canal right-of-way mapping and staking services for approximately 20 miles of canals as part of the Lake Worth Drainage District Canal Rehabilitation Program. The project consisted of staking the right-of-way lines along several Lake Worth Drainage District canals.

Horry County Stormwater Assistance

Posted on September 15th, 2020 by Suede

Bowman assisted the County in reviewing and updating their Stormwater Management Ordinance and Design Manual and in the development of a Monitoring and Assessment Plan, Enforcement Response Plan and pollution prevention/good housekeeping procedures.

Dominion Power

Posted on September 15th, 2020 by editor@bowman

Bowman provided topographic, physical and boundary surveying services, as well as civil engineering services including grading, drainage, and erosion & sediment control. The team was challenged to design with existing drainage problems in an area prone to flooding.

Chicago Sewer Design Improvements

Posted on September 15th, 2020 by editor@bowman

Design engineering services for sewer improvement projects located throughout Chicago. Work includes data collec-tion and initial assessments, coordination of survey and geotechnical engineering, utility coordination, sewer align-ments and profiles, structural design, compliance with IEPA water sewer separation requirements, cross sec-tions/typical sections, traffic control and detours, surface drainage design, OUC submittals and approvals, and permitting.

Charles City County Annual Services Contract

Posted on September 15th, 2020 by editor@bowman

Bowman was selected to perform utility engineering services for various water and wastewater systems. Bowman is responsible for attending various meetings with County staff and Supervisors, regulatory officials and representatives from the funding agencies in pursuit of financing for the below identified projects, as well as attending public meetings.

Clifton Water/Wastewater Treatment Plant

Posted on September 15th, 2020 by editor@bowman

Bowman provided a PER and Design to replace a trickling filter Wastewater Treatment Plant (WWTP) with a new 200,000 gpd Moving Bed Biological Reactor (MBBR) treatment plant installed inside of the existing concrete treatment tank. Design elements included rehabilitation of the existing influent pump station and existing operations building, a standby generator, and demolition of existing WWTP components. Additional services included surveying and civil design.

Cape Canaveral Air Force Station Fire Water Line Repair

Posted on September 15th, 2020 by editor@bowman

Bowman provided site constriction survey and stakeout support for an active drilling operation consisted of four directional drill sites and approximately 9,300 LF of fire suppression transmission water line. The team was required to provide near real time analysis of alignments and adjust to various site conditions and client constraints.