San Gabriel River Commuter Bikeway Project

Posted on January 5th, 2024 by Jillian Taylor

This project involved engineering design services for a 2.5-mile class I bicycle and pedestrian path. The entire project is built on rights-of-way controlled by the city, Los Angeles County Department of Public Works, Los Angeles County Flood Control District and Caltrans.

Sycamore Creek Sanitary Sewer Relief Interceptor, Phase III

Posted on August 29th, 2022 by editor@bowman

Our team completed the design survey of approximately 6,700 LF for the purpose of a new sanitary sewer relief interceptor in the City of Fort Worth. The proposed alignment for this project traversed through a city park, crossed US Highway 287, Sycamore Creek, and public right-of-way.

Parker County Transportation Bond Program

Posted on February 25th, 2022 by editor@bowman

As part of Parker County Transportation 2016 Bond Program, Bowman provided boundary, aerial, and topographic survey for approximately eight (8) miles of a prosed road (loop) around the City of Weatherford.

Bowman Springs Road

Posted on February 22nd, 2022 by editor@bowman

Provided design survey for the improvements and right-of-way acquisition for 6,000 LF of Bowman Springs Road. The team established control points and benchmarks at 1,000-foot intervals throughout the project site. Horizontal coordinates were obtained using GPS and vertical values were established by closed level loops from City of Arlington control monuments.

Dominion Energy Critical Transmission Substation Security Plan

Posted on November 30th, 2020 by editor@bowman

Bowman provided state-of-the-art 3D laser scanning services for Dominion Energy’s $500 million Critical Transmission Substation Security Plan program.

Route 229

Posted on September 20th, 2020 by editor@bowman

Bowman provided project management of the right-of-way and easement acquisition efforts and negotiations for 51 parcels to widen Route 229’s existing two-lane roadway to a four-lane roadway and provide curb and gutter, sidewalk, and a 10-foot shared-use path.

Route 460 Corridor Improvement Project

Posted on September 20th, 2020 by editor@bowman

This VDOT project includes construction of 55 miles of four-lane divided limited access highway. The project will be tolled with funds used to pay for project costs. The project also includes design of intermediate interchanges at four major crossroads. The project made it to 15% before getting canceled by VDOT.

XTO to Bluestone Pipeline

Posted on September 15th, 2020 by editor@bowman

Bowman provided pipeline and ROW design, project coordination with routing, land agents, environmental, archeological, and geotechnical sub-consultants, construction and surveying, and preparation of construction documents including major horizontal drilling designs for numerous road and railroad crossings, creeks and wetlands.

VDOT Route 123

Posted on September 15th, 2020 by editor@bowman

Bowman is providing structural and right-of-way services for this new interchange that will build Route 123 over Route 1 to separate through traffic, and connect Route 123 to Belmont Bay Drive east of the railroad. Both Routes will be widened from four to six lanes.

Middlesex Regional Water System

Posted on September 15th, 2020 by editor@bowman

Bowman is assisting the Middlesex Water Authority with developing a regional water system in lower Middlesex County. Due to poor groundwater quality in the individual shallow wells throughout the eastern portion of the County, the MWA has sought to develop a regional water system to serve the entire eastern section of the County. This effort […]