This project consisted of four directional drill sites and approximately 9,300 LF of fire suppression transmission water line. Bowman was responsible for staking the centerline of the proposed construction route, which was then used by the contractor to install a silt fence and construct a new 18-inch ductile iron water transmission line. Bowman also white-lined construction areas, in phases, for utility locates and located utilities after the contractor had potholed the located utilities. Additionally, Bowman provided open cut staking, white lining for utilities and as-built of pipe and existing utilities for approximately 9,300 LF of fire suppression transmission line.