A new leach pad is being developed to meet the needs of a new pit. A major earthwork and multi-plate overpass project was undertaken to link the existing conveyor system to the new leach pad. As part of this project, Bowman provided temporary traffic control and temporary road designs as well as engineered drawings, specifications, construction scopes of work, and bid packages for the earthwork stormwater controls and new traffic underpass.