Bowman supported the Town of Queen Creek on an improvement project for water and sewer collection system improvements within the mid-section Ryan Road Alignment. Bowman provided survey and design engineering services for this project. The project consists of designing four independent sets of mile-ling infrastructure plans. The project requires coordination for future utility stubs and ancillary appurtenances. Concurrent subsurface utility exploration will be conducted for all plans sets during the design phase. All legal descriptions and exhibits associated with the new projected water line and sewer line easements will be developed. Bowman is providing technical analysis and reports for Sewer Capacity, Sewer Depth, Drainage Basin Study and Pipe Class Determination.