Confidential client in SE Arizona commissioned Bowman to conduct construction quality assurance (CQA) for articulated concrete blocks (ACB’s) installed in reclaimed mine areas for spillway down chutes. Verified installation of subgrade, geotextile, filter layer, geogrid, mats, concrete grout lines and anchor trenches to meet manufacturer’s specifications.