Due to flood damage in March of 2019, our team was hired to design and oversee construction of this replacement bridge. This bridge was designed and constructed in 3 years. This project used Federal Aid funds for construction and design cost.
This project consisted of a 995’-0”, 7 span across the Niobrara River, pre-stressed concrete girder NU1600 bridge, roadway grading, concrete paving, erosion control, threatened and endangered species inspections.