Bowman has been awarded a $1.4 million engineering design services contract by J. Ranck Electric, Inc (JRE) for a new 200 MW solar array located in the Mid-Western United States. This contract builds on $2.1 million of awards that the Company received from JRE in late 2022.
Bowman will provide special use permit planning and engineering design services including civil design, electrical engineering for array design, and structural engineering for balance of systems equipment foundations. Given the flat topography of the location, Bowman’s working closely with the local drainage commission to ensure conformance with complex regulations governing grading and drainage design relating to stormwater management.
“The solar segment of the renewables market has exploded in the last year following the passing of the Inflation Reduction Act,” said Dan Swayze, EVP of energy services at Bowman. “Our extensive experience in utility-scale solar positions us to deliver these specialized services and keep pace with the market’s rapidly changing requirements. We are pleased to have been selected for this marquee solar project and anticipate being engaged in many more assignments like this one in the future.”