Unloading Facility & Metering Station

Posted on November 29th, 2023 by Jillian Taylor

JP Energy Partners planned a crude oil gathering, storage and mainline pump facility located south of Cherokee, OK and a crude oil pipeline metering station at Cushing, OK to serve the new Great Salt Plains 8” Crude Pipeline originating in Cherokee, OK and terminating in Cushing, OK.

Capital One Headquarters

Posted on October 26th, 2021 by Suede

The short circuit analysis, protection device coordination study, and arc flash analysis provides appropriate equipment ratings and settings for all adjustable overcurrent protective devices that are installed in Capital One Office Building. An Arc Flash Study was conducted to calculate the potential arc flash energy at electrical equipment in the system.

3150 Fairview Park Drive

Posted on October 26th, 2021 by Suede

Bowman provided Arc Flash analysis for the 260,000 sq. ft. office building in Falls Church, VA. The short circuit analysis, protection device coordination study, and arc flash analysis provides appropriate equipment ratings and settings for all adjustable overcurrent protective devices that are installed in the building.

Century Link Data Centers

Posted on October 26th, 2021 by Amy Talton

Bowman provided short circuit analysis, protection device coordination study, and arc flash analysis for three Century Link data centers in Virginia, Colorado and Washington. We provided appropriate equipment ratings and settings for all adjustable overcurrent protective devices that are installed in the data centers.