75th Street Intersection Improvements

Posted on September 15th, 2020 by Renee Narvaez

Phase I Engineering Services to evaluate four intersections to identify improvements that will address the accident history, increase the safety of the intersections, and create continuity throughout the corridor while minimizing impacts to the operational characteristics of the intersections. Includes Intersection Design Studies, Drainage Technical Memo and preparation of a Project Development Report for 75th Street.

55th Street Reconstruction

Posted on September 15th, 2020 by Renee Narvaez

Phase II design engineering services for the widening and resurfacing of 1.75 miles of 55th Street to address safety and operational needs and to provide expanded pedestrian. The closed drainage sys-tem will be upgraded with new trunk sewers and drainage structures and includes the extension of a 4’x4’ box culvert.