Chico’s
Bowman continues to serve Chico’s as their Site Development Engineer as they aggressively grow and expand. The original 27-acre site served the corporation for design, research, marketing and other administrative functions.
Bowman continues to serve Chico’s as their Site Development Engineer as they aggressively grow and expand. The original 27-acre site served the corporation for design, research, marketing and other administrative functions.
Bowman worked with city staff, community stakeholders and an archaeologist to develop a design that integrates a community gathering space, an active play area for children 2-5 years old, and the history of the site.
Our team redesigned Cumberland Drive between Military Trail and Village Boulevard to accommodate one-way, separated bicycle lanes using vertical delineators. The project also included design of a roundabout at the Saratoga Road intersection that accommodated separate bicycle and pedestrian crossing treatments. Efforts included agency coordination.
Bowman provided full-service engineering, environmental consulting, surveying and construction administration for a new seven-story residential building and structured parking deck in Tysons, VA.
This project consists of a four-story, 178-unit, mixed-income apartment complex located in the Eckington area of Washington, DC on a site of approximately 1.6 acres. The historic convent building on the site was moved and is incorporated into the apartment building design, including approximately six rental units, and was built in accordance with historic preservation guidelines.
As part of the 2.5 million sq. ft. redevelopment project known as Arbor Row, located within the heart of the new Tyson Urban Center, Bowman provided full service engineering, environmental, surveying and construction administration services for the first two synthetic turf fields in Tysons, VA.
As part of the effort to replace the military’s inventory of obsolete and inadequate housing with safe, comfortable homes for military families, JB Andrews hopes to rehabilitate existing units and provide new units, producing high quality housing for military families.
Our team served as the electrical, civil, and structural engineer for the Wadesboro Solar project. We also acted as the design project manager, working closely with the developer, installer and equipment manufacturers to efficiently execute the design of this 5 MW AC (7.65 MW DC) solar PV system located in Wadesboro, NC.
This project was located on the coast in harsh and wet environmental conditions near the North Carolina Albermarle Sound. Our team provided the full electrical design (PV system, auxiliary power, medium voltage design) and the structural design (inverter group structures, equipment pads).
Our team worked with a local utility company, Delta Montrose Electric Association (DMEA) to design 10 kW grid connected PV systems for several local schools. In addition to providing modest energy offset, these solar electric systems serve as educational and demonstration systems at five high schools located in Delta and Montrose counties.