Explorer Pipeline Fauna Facility Upgrade

Posted on November 18th, 2023 by Jillian Taylor

The Fauna Facility Upgrade Project in Houston, Texas consisted of two phases, both of which centered on optimizing the tank to mainline flow. Phase I installed new piping from an existing surge relief system to the suction side of two existing mainline units. A new turbine meter, small volume prover, and new piping were installed downstream of the two existing mainline units.

Long Beach Blvd. Improvement Project

Posted on October 23rd, 2023 by Renee Narvaez

Our team provided construction management, inspection, and labor compliance for the resurfacing of 192,779 sq. ft. of roadway in Lynwood, CA. Other activities included renovating sidewalks, driveway approaches, curbs and gutters and constructing six new bus pads.

Montebello Blvd. Complete Street Project

Posted on October 19th, 2023 by Renee Narvaez

The scope of work under Phase II of the Montebello Boulevard Bike Lane and Sidewalk Improvement project included design, preparation of PS&E for roadway improvements and widening, pavement rehabilitation, concrete improvements, sidewalk improvement, utility adjustments, ADA improvements, Class II bike lane, traffic signal improvements and pedestrian lighting

Downtown Beautification Project

Posted on October 19th, 2023 by Renee Narvaez

The scope of work included replacing existing streetlight and traffic signal infrastructure with new decorative infrastructure designed to identify and create visual points of interest that highlight and activate the Baldwin Park community.

Bordentown Hotel and Car Wash

Posted on September 29th, 2023 by Jillian Taylor

Our team was retained to perform traffic engineering and highway design services in support of the 128-room, four-story hotel and car wash facility along US Route 206 in Bordentown Township. We prepared the project traffic impact study, highway access permit plans in support of site plan approval by the Township and Access Permit approval by NJDOT.

Page Field (FMY) General Aviation Terminal

Posted on September 27th, 2023 by Jillian Taylor

The complex consists of a 22,000 sq. ft. terminal building, 24,000 sq. ft. bulk hangar, parallel taxiways to two runways, new 600,000 sq. ft. apron along with landside improvements including a new access road and vehicular parking. The project also included utilities, lighting, landscaping, signage and a new fuel farm.

Miromar Outlets

Posted on September 27th, 2023 by Jillian Taylor

Miromar Outlets is situated on a 75-acre parcel located north of Corkscrew Road, between I-75 and Ben Hill Griffin Parkway. The project is a portion of the Timberland and Tiburon DRI, and is zoned CPD with 700,000 sg. ft. of building area approved. Miromar Outlets features more than 140 top designers and brand name outlets, plus restaurants, banks, a gas station and the main offices for Miromar Development Corporation.

Gateway Charter Elementary School

Posted on September 27th, 2023 by Jillian Taylor

Gateway Charter School is a member of the Charter Schools USA family of schools. Charter Schools USA is one of the largest providers of charter school management services in the state of Florida. CSUSA manages private and municipal charters for grades Pre-K through 12.

Fiddler’s Creek Residential Community

Posted on September 26th, 2023 by Renee Narvaez

This 6,000 unit residential/golf course community encompasses 3,932 acres located in southern Collier County. Bowman has provided extensive engineering and surveying services and participated in the planning and environmental permitting of this project.

Coconut Point

Posted on September 26th, 2023 by Jillian Taylor

Bowman helped to bring this unique concept of managing urban living with retail shopping to Southwest Florida. Our team provided site/civil engineering, survey, landscape architecture and construction phase services for the project – the largest of its kind in the United States.