As part of Parker County Transportation 2016 Bond Program, Bowman provided boundary, aerial, and topographic survey for approximately eight (8) miles of a prosed road (loop) around the City of Weatherford.
As part of Parker County Transportation 2016 Bond Program, Bowman provided boundary, aerial, and topographic survey for approximately eight (8) miles of a prosed road (loop) around the City of Weatherford.
A 5-story, 127-room hotel is located on a 1.2-acre tract as part of an existing 9.5-acre campus. The campus includes two other chain hotels and a 6,300 sq. ft. restaurant. The team provided planning/zoning, landscape architecture, civil/site engineering and survey/topographic mapping.
A 30-story mixed-use development in downtown Louisville consist of 612 hotel suites and 225 luxury apartment units. The hotel was built on the site of the former Louisville Water Co., and was designed to blend the charm of the city and modern luxury.
Provided design survey for the improvements and right-of-way acquisition for 6,000 LF of Bowman Springs Road. The team established control points and benchmarks at 1,000-foot intervals throughout the project site. Horizontal coordinates were obtained using GPS and vertical values were established by closed level loops from City of Arlington control monuments.
As part of a four-year, $125M major renovations and additions project, the team provided surveying, site layout and civil engineering services for the Norton Audubon Hospital Campus site.
The team is providing survey, site design, layout, planning approval, civil engineering and construction staking services for this new five-story 120,000 sq. ft. medical facility.
Bowman provided state-of-the-art 3D laser scanning services for Dominion Energy’s $500 million Critical Transmission Substation Security Plan program.
Bowman provided surveying services for the demolition of an existing school and the construction of a new 2-story elementary school building. Surveying services were provided to aid three development companies, including construction staking for the construction of the site, utilities, and the building’s infrastructure.
Provided preliminary topographic and ALTA surveys, preparation and processing of the site plan through the city, design for permitting for the renovation of parking and loading dock facilities, storm drainage analysis and design, fire line plans, coordination with security consultant Aronson Security Group (ASG) for detailed security perimeter.
Bowman provided a feasibility study and a layout for the preliminary site, extensive topographic survey, floodplain study and alteration, as-built survey, preliminary earthwork analysis, final site design/permitting, utility coordination construction administration services as well as construction stake-out and final as-built surveys.