90MW Power Island Design for Data Canter

Southeastern United States

Bowman was engaged to develop an issued for construction (IFC) package for a 90MW power island supporting a data center in the southeastern United States. The system design is anchored by reciprocating natural gas engine packages, integrated with all required balance of plant equipment to deliver reliable, continuous power.

The IFC package included complete design documentation across mechanical, electrical and instrumentation and controls disciplines. To support the project’s aggressive timeline, our scope also included project management oversight and detailed project controls reporting.