This project included preliminary planning, sitework design, preparation of construction plans and specifications, permitting and construction administration for a 7,000 sq. ft. commercial building, a 7,758 sq. ft. restaurant and a future commercial building on a 3.3 acre site. The stormwater system consisted of pipework and a stormwater detention pond for the entire site. Permitting through the City of Pensacola, Emerald Coast Utilities Authority, NWFWMD ERP, and FDOT was required. Deceleration and turn lanes at one of the busiest intersections in Pensacola were permitted through FDOT. The sewer design required a lift station and force main under Davis Highway to an existing ECUA manhole a block away.