Confidential Arizona Data Center

Phoenix, AZ

The masterplan for the client facility will be looking at the entire campus, encompassing Buildings A, B and C, to utilize 50MW in Building A, 20MW in Building B, and 50MW in Building C. Scope includes preliminary meetings, surveys and investigations to determine if the site should be modernized and conceptual grading and utility design.