The development of a new pit at this mine required additional infrastructure. Bowman, having previously designed the original settlers during another project, designed two new Wash Settlers with related structures, containment, equipment, storage, piping and instrumentation. Bowman provided engineering, CQA and construction management services throughout the duration of the project.