Our team of experts worked with the Army Corps of Engineers (COE) to perform a controlled topographic survey at Fort Pickens Beach to establish control points for the piles to accommodate the building of a pedestrian pier. The survey was controlled because artifacts had been discovered close to the proposed construction site. We used Global Positioning System (GPS) and Total Station equipment and software to compile the points marked by divers provided by Army Corps of Engineers.