Our team supported the development of a 600-acre, 105 MW solar facility with an integrated 20 MW battery energy storage system (BESS). The project combines solar generation with on-site storage to improve energy reliability and flexibility, aligning with California’s clean energy targets.
Engineering services included grading and drainage design, hydrology studies and civil infrastructure planning tailored to the site’s terrain and environmental requirements. Stormwater management and permitting support ensured compliance with local and state standards, while advanced erosion and sediment control measures were implemented to protect sensitive landscapes during construction.
Structural engineering scope covered foundation systems for fencing, inverters, wire management and BESS components, supporting long-term performance and cost efficiency. By combining renewable generation with integrated storage capacity, the facility delivers a resilient and scalable energy solution for the region.