Naper South

Boyd County, NE

Due to flood damage in March of 2019, our team was hired to design and oversee construction of this replacement bridge. This bridge was designed and constructed in 3 years. This project used Federal Aid funds for construction and design cost.

This project consisted of a 995’-0”, 7 span across the Niobrara River, pre-stressed concrete girder NU1600 bridge, roadway grading, concrete paving, erosion control, threatened and endangered species inspections.