Bowman partnered with Rockcliff Energy to conduct a preliminary survey and perform construction staking for an 88-mile saltwater gathering system. This system, designed to enhance the efficiency of saltwater disposal in midstream operations, aimed to eliminate the dependence on conventional 18-wheeler disposal methods.
Our team surveyed the East Texas terrain to identify optimal pipeline routes and determine potential construction challenges. By providing Rockcliff Energy with detailed insights from the preliminary survey, Bowman sets the foundation for streamlined pipeline construction and installation.