The client was looking for a safer and more efficient way to transfer ore to the main course ore bin. The existing ore dribble chute was scanned in 3D and used to design a new dribble chute and platform. The new dribble chute design changed the location of discharge from a conveyor directly to course ore bin. Bowman produced general arrangements and mechanical drawings for the project.