This 5 span, 180’-0” long bridge replacement project included a bridge over the Blue River on the south edge of Seward, NE. This cast in-place concrete slab bridge was designed to handle the frequent flooding of the Blue River.
This 5 span, 180’-0” long bridge replacement project included a bridge over the Blue River on the south edge of Seward, NE. This cast in-place concrete slab bridge was designed to handle the frequent flooding of the Blue River.