This 4-span 265’-0” pre-stressed concrete inverted tee girder bridge was constructed over the North Fork Big Nemaha River. Our team performed topographic survey, hydraulic survey, roadway design, bridge design, construction inspection and administration. We utilized AASHTOWare Site Manager to document the project.