This project was conducted under the Virginia Department of Transportation Statewide Surveying Services Term Contract. The project consisted of establishing secondary control for survey work, performing field run topographic/planimetric surveys on approximately 80-acres, annotating the existing photogrammetry, property corner recovery and location, and storm sewer/drainage as-built preparation and delivery in accordance with VDOT standards. This section of the overall project begins at the intersection of Berkmar Drive and Hilton Heights Road, north along a future defined CL to the intersection with Town Center Drive, with a mapping corridor width of 1000 feet. Additionally, Bowman conducted field reconnaissance and recovery of property and right-of-way boundaries, and acquired field ties of monuments, and evidence of occupation for approximately 42 parcels.