Walking Bridge Replacement

Confidential

Bowman provided damage investigation, claim support, design, permitting, material procurement, and engineering support services during the construction of an approximately 104 FT span walking bridge to replace a pile bent supported walkway that was damaged by an aberrant barge at this petroleum facility.

Bowman proposed a new 104 FT span aluminum walkway bridge to replace the damaged walkway which was constructed using 2, 2 pile bents and 3 walkway spans. Bowman design eliminated the expensive 2, 2 pile bents and cathodic protection requirements, saving client 40% of the estimated costs.