Bowman provided surveying services for six Whole Foods Markets sites across Florida. Bowman prepared a topographic survey to provide the basis for the final array layout. Bowman recorded the dimensions of the roof inside of the parapets (the height of parapet off of the roof deck every 20 feet or where vertical changes occurred), the locations of roof cricketing changes as lines representing ridges and valleys on the roof surface, all gas, electrical and condensation lines on the roof, all areas of visual water ponding and compromised/damaged areas, all RTUs, HVAC, air handlers, and any other equipment on the roof, and the perimeter of all roof pad walkways around large equipment.