San Diego State University, Snapdragon Stadium

Posted on January 12th, 2023 by Ji Lee

Our team was selected to lead the design team for San Diego State University (SDSU) in building a world-class university campus, research center and multi-use stadium in Mission Valley. The project will serve higher education, the public good and the community’s goals and aspirations.

McLane Stadium

Posted on August 4th, 2022 by Renee Narvaez

A 160 acre boundary and topographic survey along the Brazos River that was used for the civil engineering design for the new football stadium. As part of the survey, second order Horizontal and vertical control was to ensure the highest accuracy standards for the planned civil engineering design that included not only the stadium but a marina and multiple platforms along the Brazos River.

Villanova Pedestrian Bridge

Posted on June 8th, 2022 by Renee Narvaez

The team completed the engineering and design of a pedestrian bridge and associated roadway improvements. Villanova’s ultimate vision was to transform an existing paved surface parking lot between Lancaster Avenue and the SEPTA Norristown HighSpeed Rail Line into an attractive living and learning environment.

Arundel Elementary School

Posted on May 20th, 2022 by Renee Narvaez

A new ±113,000 sq. ft. elementary school (Pre K-2 Grade) with student capacity of 636. The team provided mechanical, plumbing and fire protection design. The scope included all new HVAC system, nine variable refrigerant systems and three single zone VAV rooftop units.

Wheaton Woods Elementary School

Posted on May 20th, 2022 by Renee Narvaez

A new elementary school is designed to accommodate 740 students. The team provided mechanical, electrical, plumbing and fire protection design, and the facility was designed to exceed ASHRAE 90.1 requirements, IBC and Montgomery County Energy Conservation Codes, as well as recommendations from the publication “Energy Efficient Design for New Buildings.”

Paul Duke STEM High School

Posted on March 11th, 2022 by Renee Narvaez

The team coordinated and assisted site design, construction documentation, stormwater management, hydrology, permitting and construction administration for this new 300,000 sq. ft., STEM high school for Gwinnett County Public Schools.

Boulder Valley School District – Districtwide Bond Facility Improvements

Posted on January 3rd, 2022 by Renee Narvaez

Bowman was selected under a multi-year term contract to assist the Boulder Valley School District reach aggressive energy-saving goals outlined in the District’s Sustainable Energy Plan. The plan includes zero net energy targets for new facilities and retrofit energy reductions. Bowman provided commissioning, energy audits, design assistance and monitoring/verifications services.

Buena Vista Middle and High School

Posted on December 6th, 2021 by Renee Narvaez

Bowman provided commissioning services to ensure the equipment is designed, installed, and performs as expected in concert with the owner’s requirements, delivering comfort and safety in support of the district goals.

Steamboat Springs School District RE-2 Bond Effort

Posted on December 6th, 2021 by Renee Narvaez

Bowman was selected as the sole-source district-wide commissioning agent. The 2017 commissioning project involved the modernization of the HVAC and lighting systems at Steamboat Springs Middle School. Our successful work on the middle school led to selection as sole-source commissioning agent for the district’s 2020 bond.

Columbine Middle School

Posted on December 6th, 2021 by Renee Narvaez

Bowman was selected as the sole-source district-wide commissioning and building performance agent. The project was partially funded by $13M BEST grant. Bowman commissioned systems including mechanical, electrical, domestic water, lighting controls, renewable energy systems and monitoring systems, and provided building envelope testing.