Weld County School District RE-4

Posted on December 6th, 2021 by Renee Narvaez

Bowman was selected for third party commissioning services for the construction of a new High School (HS2), renovation and addition to an existing High School (WHS), and MEP upgrades to 10 other District facilities.

The Madeira School STEAM Building

Posted on October 27th, 2021 by Renee Narvaez

Bowman was responsible for the mechanical and plumbing engineering design for the new construction of a 32,955 sq. ft. Science/Technology/Engineering/Arts/Mathematics (STEAM) building. The four-story building consists of student class rooms for Math, Robotics, Ceramics, Digital Arts, a Maker Space, Physics, Biochemistry, Chemistry, Arts, and Biology.

MacFarland Middle School

Posted on October 26th, 2021 by Renee Narvaez

Bowman provided mechanical, electrical, and plumbing commissioning services to MacFarland Middle School located at 4400 Iowa Ave, NW. The newly renovated three-story school was built in 1923. Additions to the original building were constructed in 1925, 1927 and 1932, and in total, the building consists of approximately 110,000 sq. ft.

Westgate Elementary School

Posted on October 25th, 2021 by Renee Narvaez

Bowman completed the design for the MEP engineering design for the renovation of the 42,000 sq. ft. addition to Westgate Elementary School located in Falls Church, Virginia. Since the facility almost doubled in size, the mechanical, plumbing, and electrical systems were upgraded to provide the required services.

GWU Old Main

Posted on October 25th, 2021 by Renee Narvaez

Our engineers provided mechanical, electrical, and plumbing design services for the renovation of this 60,000 sq. ft., four-story historic building in Washington, DC.

Stono Park Elementary School

Posted on September 29th, 2020 by Renee Narvaez

Bowman provided surveying services for the demolition of an existing school and the construction of a new 2-story elementary school building. Surveying services were provided to aid three development companies, including construction staking for the construction of the site, utilities, and the building’s infrastructure.

Tuscarora High School

Posted on September 29th, 2020 by Renee Narvaez

Bowman provided engineering, environmental consulting, project review and oversight during the construction of the high school, infrastructure, and stream restoration project.

Elementary School Classroom Additions

Posted on September 22nd, 2020 by Renee Narvaez

Loudoun County Public Schools retained Bowman for the construction of 4,800 sq. ft. 3-classroom additions to 6 existing elementary schools. Each school addition was a separate site plan design and application process including geometric layout, grading, roof drain design, analysis of the existing SWM/BMP system, erosion & sediment control measures, and coordination with the architect.

Alice West Fleet Elementary School

Posted on September 22nd, 2020 by Renee Narvaez

The project involves the construction of a new elementary school on the existing campus. To maintain critical open space, a new two-level below-grade parking structure with access from a new bus driveway was proposed below the footprint of the new school building. Bowman provided a full scope of civil engineering services.

U.S. Naval Academy Hammer Throw Field Improvements

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying, civil engineering, site and landscape plans, and a forest conservation plan for this project at the U.S. Naval Academy in Anne Arundel County, Maryland. Bowman’s scope of services included regrading and providing swales around the hammer throw fields to provide stormwater management through swale infiltration.