Bickford South Eby Senior Living Facility

Posted on September 15th, 2020 by Renee Narvaez

Bowman performed due diligence and land use entitlement services for this 60-unit senior living facility including boundary and topographic surveys, due diligence and preliminary engineering, a preliminary traffic assessment, final site plan preparation and construction plans, and land acquisition transaction services, including an ALTA/ACSM Land Title survey, lead and asbestos survey, easement plats, VSMP General Permit and SWPPP, and subdivision platting.

Austin Regional Clinic

Posted on September 15th, 2020 by Renee Narvaez

This project, situated on approximately 2.48 acres, includes medical offices, a coffee shop, and an associated parking lot. Bowman provided site plan preparation including grading, paving, drainage, on site water and wastewater lines design and parking requirements. This was the first site plan in the City of Kyle with zero set back lines. Bowman helped to introduce this new urban development concept to the City.

Arbor Terrace

Posted on September 15th, 2020 by Renee Narvaez

Arbor Terrace provides 82 residential units for assisted living within a new three-story building and includes the construction of new internal paved access drives and parking areas throughout the site. Bowman provided civil engineering, surveying, permitting, and construction administration services.

Alexander’s Crossing

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning, surveying, and civil design serves to deliver a mixed-used development on 701 acres. The team was challenged to incorporate elements of includes retail, office, multi-family, townhome, and single family uses in a tight and topographically constrained site.