Federal Aviation Administration, ATCT Life Safety Assessments

Posted on October 4th, 2023 by Renee Narvaez

At over 65 locations throughout the eastern United States, our team designed modifications to air traffic control towers’ (ATCT) fire and life safety systems in order to comply with new OSHA standards and FAA criteria.

Air Traffic Control Tower, Piedmont Triad International Airport

Posted on October 3rd, 2023 by Renee Narvaez

The Federal Aviation Administration (FAA), Eastern Services Area was constructing a new air traffic control tower and base building at the Piedmont Triad International Airport (GSO) in Greensboro, North Carolina. Our team provided BIM-level fire protection and fire alarm system design services and life safety analysis.

Aircraft Maintenance Hangar, Pensacola International Airport

Posted on September 19th, 2023 by Renee Narvaez

The City of Pensacola constructed a new aircraft maintenance hangar of approximately 160,000 sq. ft. and consists of two non-separated hangar bays and associated support spaces. As part of the design team, our fire protection engineers provided fire protection system design services and life safety analysis.

United Airlines Aircraft Maintenance Hangar, O’Hare International Airport

Posted on September 19th, 2023 by Renee Narvaez

Our team provided fire protection consulting and commissioning services for the existing fire protection system. The scope also included retro-commissioning of the entire foam fire suppression releasing system, including all input and output devices, and provided recommendations for modifications or upgrades to the system to reduce the potential for future inadvertent discharges.

Terminal 5 – M Fuel Extension Fuel Package at O’Hare Airport

Posted on September 15th, 2020 by Renee Narvaez

Bowman is providing resident engineering services for this fuel loop being constructed in advance of the new International Terminal (T5) Building expansion.