American Castings Foundry Grounding Study
Our team conducted a grounding study of the 13.8 kV Substation Area. An overall ground resistance report was developed and the limitations discussed. A new grounding plan with installation detail drawings for the upgraded ground grid required for new equipment installation was developed along with a grounding study report documenting findings and recommendations.