Kirk Road Reconstruction and Utility Relocation
Our team is currently preparing roadway design plans for the reconstruction of an 0.8-mile roadway segment on Kirk Road, from Summit Boulevard to Gun Club Road, in Unincorporated Palm Beach County.
Our team is currently preparing roadway design plans for the reconstruction of an 0.8-mile roadway segment on Kirk Road, from Summit Boulevard to Gun Club Road, in Unincorporated Palm Beach County.
Since 2003, our firm has been a transportation consultant to the City of Fort Myers on multiple, consecutive contracts that have precipitated numerous design, planning, and traffic engineering projects. Our team has carried the Challenger Boulevard at Winkler Avenue project from study/conception to final design.
Our team prepared design plans for a half-mile segment of NW 31st Avenue, from NW 39th Street to NW 44th Street. The City initiated this LAP/JPA (Joint Permit Application) project to implement complete streets, particularly to provide sidewalk along the east side, providing safer pedestrian access to transit stops.
Our team completed multiple tasks on a Continuing Service Traffic Signal Design Contract with the Palm Beach County Traffic Division. Assignments included a school zone LAP project and preparation of traffic signal installation plans for multiple county intersections.
Our team was hired by UNMH to determine existing conditions within the proposed project limits. UAV-based imagery was generated for the immediate site and surrounding area comprised of approximately 143 acres of UNM North Campus.
Our team recently completed surveying and mapping of a large portion of the BNSF site in Belen, NM. The purpose of the survey was to determine existing conditions for several different future improvements contemplated at that facility.
4MLK is the first of two new gateway buildings to be prominently located at the entrance of the research park. Bowman is responsible for the MEP design services for the first Gateway building, a 266,000 sq. ft. facility. The building is designed LEED Silver and exceeds ASHRAE 90.1-2010 by 20%.
Our team was contracted to provide land surveying, civil design services, construction administration and construction staking for an apartment housing project containing 232 units – six story apartment building with a parking garage on the first floor.
The once vibrant and actively used ball park, known as the Moana Stadium, had become an eyesore in need of an overhaul. Thanks to the championing efforts of the Reno City Council, City staff and the Great Basin Youth Soccer League, the stadium was able to turn into a community asset.
The Kendyl Depoali Middle School is located on the southeast corner of Wilbur May and South Meadows Parkways. Our team developed preliminary and final landscape plans for this new middle school prototype developed for the Washoe County School District by Van Woert Bigotti Architects.